Some structural ideas needed by a site engineer Keep sharing.
Some structural ideas needed by a site engineer Keep sharing. A Site Engineer has a lot of structural ideas. Likewise, some of the structural issues were shared. If you have an opinion on a piece of information you can share in the comments. Shear Key in Column: The shear key is kept at the construction joint (especially in the column) for two main reasons Shear Resistance of 3 Column to Increase Capacity Displacement within the Adjacent Segment of the 4 columns to minimize the risk. ✅Shear Key is usually kept at a depth of 2 "to 4", so keep in mind that the hole is well # cleared before the next molding. ✅ It would be best if the hole is covered with polythene the next day after welding so that it can be easily removed. Column Casting Height: In many cases, the contractor is casting a Full Height Column to finish the job in a timely manner, which is not a requirement at all. In this case, you must cast columns in two or more elevators, which can happen if you do not ✅ Void o...