Detailed about the road

Detailed about the road


1. All kinds of information about the road
2. Different materials in the street
2.State Estimate
All kinds of information about the road
What is the bitumen road?
Urn: At the time of making the pavement of roads, bitumen content is used as the bracket material, it is called a bitumen road.
Who is called the extreme enemy of Bituminous Street?
The water in the accumulation
Design Integrity
 What is BST?
Urine: Bituminous surface treatment
 What is the reason why water is the extreme enemy of Bituminous Street?
Outer: Bituminous road congestion in the street quickly damaged due to bituminous roads. As a result, many potholes were created in the street. As a result, the use of road use is lost. So the water is called the extreme enemy of Bituminous Street.
Design Integrity
What are potholes?
Hora: When the hole is formed in the street, the holes are called potholes.
 What are the steps to speed down the bituminous?
Upper: sub-grade, sub-base, prime note, tax coat, Sialkot
What is the full moon?
Ur: Roads and Highways
Which code to follow in the road and highway design?
Key: AASHO
What is used to prevent the speed of the bike on the bituminous road?
Ur: Speed-breaker,
Design Integrity
Bituminous street vio is called a level?
The sub-grade level
 Which coat is applied quickly with the implementation of the tax cost?
Urr: Sialkot
What does the regional and national road sign on the road signboard?
UROR: Regional - R
National - N
Design Integrity
What is the main reason for street illumination of Super Elevation?
Ure: For the prevention of the vandalized traffic in the street.

Road MARKING What colors are used?
Ure: Thermo-Plastic Paint
What is DBM?
Urn: Dense Bitumen Macadam
 What are the measures for draining water on bituminous roads?
Ur: L-Drain, Catch pit,
 Why is the tip of the road on bituminous roads on both sides?
For: To keep the road or alignment, to prevent road erosion, to keep the sub-bases, wiring coats in good condition.
Design Integrity
How many road markings are there on the streets of Bituminous road?
Uro: 3 kinds.
What is the name of the grass on the two sides of the bituminous road?
UR: Tarf
What do the arrow on the left side of the bituminous road and the arrow on the right mean?
Arrow: Left arrow - just move left
Right arrow - Just go to the right. Design Integrity
 Is there any dedication in the streets of Bangladesh?
Roads & Highways Department
 What is Bitumin?
Uranium: Bituminous organic compounds containing black or brown colored muffins. Which is used to make roads?
What is the name of the test done to know the bearing capacity of soil on the bituminous road?
Urr: CBR test
What is the reason for Cambara?
Urra: The road shroud is called Cambay.
Basically, the main reason given for Cambay is to drain water quickly from the road. Design Integrity
 Is there a bit of bitumen used in the streets in Bangladesh?
High: 80/100
Break line, continuous line, what is meant by the double continuous line on the bituminous path?
Ure: Break line - Taking the car over
Continuous line-car cannot be over
Double Continuous line- Taking the car over is prohibited ... Design Integrity
What is the name of the 4, 5 road crossings to prevent the speed of the car at the lower height of the speed-breaker?
Url: Rumble Strip
 What is the Crown and the Gradient?
Urn Crown: The high end of the road is called the Crown.
Gradient: The vertical slope of the road is called gradient.
"X" in the circle of Bituminous road sign
What do you mean by the symbol?
WARNING: It is forbidden to stop cars. Design Integrity
What is the name of some of the bituminous test?
Urine: Ductility, penetration, Bitumen content, Marshall stability
 What does carriageway mean?
Ure: The traffic between the two sides of the road is on the ripe part of the road, so the carriageway. Design Integrity
The bituminous the road is so popular in Bangladesh?
Urine: Low cost, easy to finish and retrograde, can be used very quickly after burning.
What is SSD and PSD Fulls?
SSD-Stopping sight distance
PSD-Passing sight distance
Bituminous road information and estimate
Information
Road length = 1500'-0 "
Road width = 20'-0 "
Road height = 1'-6 "
Aging = 3 "
Site dressing width = 1'-0 "
Sand mining layer 1: 1 height = 6 "
Loose Layer = 4 "
1. Cut the soil = 1500'-0 "x20'-0" x1'-6 "
= 45000 cubic feet
2. Soil dressing = 1500'-0'x0'-0 "
= 30000 sqft
3. Brick Flat Soling = 1500'-0'x19'-6 "
= 29250 sqft
[Here's the 19'-6 "came in this way
If two is excluded for the eighth position, the width = 20'-0 "-3" x2
= 19'-6 "]
4. Herring sister bond = 1500'-0'x19'-6 "
= 29250 sqft
6. Brick and egging on two sides
= 1500x2
= 3000 feet
7. Sand mining microlayer 1: 1
= 1500'-0 "x19'-6" x6 "
= 14625 cubic feet
8. Loop Layer = 1500'-0 "x19'-6" x4 "
= 9750 cubic feet
9. Bituminous carpeting
= 1500'-0'x19'-6 "
= 29250 sqft
10. Tack Coat = 1500'-0'x19'-6 "
= 29250 sqft
11. Sealed coat = 1500'-0'x19'-6 "
= 29250 sqft
12.Blinding on the street with the bar
= 1500'-0'x19'-6 "
= 29250 sqft
13. Site  Dressing = 1500'-0'x1'-0 "x2
= 3000 sqftDetailed about the road
1. All kinds of information about the road
2. Different materials in the street
2.State Estimate
All kinds of information about the road
What is the bitumen road?
Urn: At the time of making the pavement of roads, bitumen content is used as the bracket material, it is called a bitumen road.
Who is called the extreme enemy of Bituminous Street?
The water in the accumulation
Design Integrity
What is BST?
Urine: Bituminous surface treatment
 What is the reason why water is the extreme enemy of Bituminous Street?
Outer: Bituminous road congestion in the street quickly damaged due to bituminous roads. As a result, many potholes were created in the street. As a result, the use of road use is lost. So the water is called the extreme enemy of Bituminous Street.
Design Integrity
What are potholes?
Uhora: When the hole is formed in the street, the holes are called potholes.
What are the steps to speed down the bituminous?
Upper: sub-grade, sub-base, prime note, tax coat, Sialkot
 What is the full moon?
Ur: Roads and Highways
 Which code to follow in the road and highway design?
Key: AASHO
What is used to prevent the speed of the bike on the bituminous road?
Ur: Speed-breaker,
Design Integrity

Bituminous street vio is called a level?
The sub-grade level
Which coat is applied quickly with the implementation of the tax cost?
Urr: Sialkot
What does the regional and national road sign on the road signboard?
UROR: Regional - R
National – N
Design Integrity

 What is the main reason for street illumination of Super Elevation?
Ure: For the prevention of the vandalized traffic in the street.
Road MARKING What colors are used?
Ure: Thermo-Plastic Paint
What is DBM?
Urn: Dense Bitumen Macadam
 What are the measures for draining water on bituminous roads?
Ur: L-Drain, Catch pit,
Why is the tip of the road on bituminous roads on both sides?
For: To keep the road or alignment, to prevent road erosion, to keep the sub-bases, wiring coats in good condition.
Design Integrity
How many road markings are there on the streets of Bituminous road?
Uro: 3 kinds.
 What is the name of the grass on the two sides of the bituminous road?
UR: Tarf
What do the arrow on the left side of the bituminous road and the arrow on the right mean?
Arrow: Left arrow - just move left
Right arrow - Just go to the right. Design Integrity
 Is there any dedication in the streets of Bangladesh?
Roads & Highways Department
What is Bitumin?
Uranium: Bituminous organic compounds containing black or brown colored muffins. Which is used to make roads?
 What is the name of the test done to know the bearing capacity of soil on the bituminous road?
Urr: CBR test
What is the reason for Cambara?
Urra: The road shroud is called Cambay.
Basically, the main reason given for Cambay is to drain water quickly from the road. Design Integrity

 Is there a bit of bitumen used in the streets in Bangladesh?
High: 80/100
Break line, continuous line, what is meant by the double continuous line on the bituminous path?
Ure: Break line - Taking the car over
Continuous line-car cannot be over
Double Continuous line- Taking the car over is prohibited ... Design Integrity
 What is the name of the 4, 5 road crossings to prevent the speed of the car at the lower height of the speed-breaker?
Url: Rumble Strip
 What is the Crown and the Gradient?
Urn Crown: The high end of the road is called the Crown.
Gradient: The vertical slope of the road is called gradient.
 "X" in the circle of Bituminous road sign
What do you mean by the symbol?
WARNING: It is forbidden to stop cars. Design Integrity
 What is the name of some of the bituminous test?
Urine: Ductility, penetration, Bitumen content, Marshall stability
 What does carriageway mean?
Ure: The traffic between the two sides of the road is on the ripe part of the road, so the carriageway. Design Integrity
The bituminous road is so popular in Bangladesh?
Urine: Low cost, easy to finish and retrograde, can be used very quickly after burning.
What is SSD and PSD Fulls?
SSD-Stopping sight distance
PSD-Passing sight distance
Bituminous road information and estimate
Information
Road length = 1500'-0 "
Road width = 20'-0 "
Road height = 1'-6 "
Aging = 3 "
Site dressing width = 1'-0 "
Sand mining layer 1: 1 height = 6 "
Loose Layer = 4 "
1. Cut the soil = 1500'-0 "x20'-0" x1'-6 "
= 45000 cubic feet
2. Soil dressing = 1500'-0'x0'-0 "
= 30000 sqft
3. Brick Flat Soling = 1500'-0'x19'-6 "
= 29250 sqft
[Here's the 19'-6 "came in this way
If two is excluded for the eighth position, then width = 20'-0 "-3" x2
= 19'-6 "]
4. Herring sister bond = 1500'-0'x19'-6 "
= 29250 sqft
6. Brick and egging on two sides
= 1500x2
= 3000 feet
7. Sand mining microlayer 1: 1
= 1500'-0 "x19'-6" x6 "
= 14625 cubic feet
8. Loop Layer = 1500'-0 "x19'-6" x4 "
= 9750 cubic feet
9. Bituminous carpeting
= 1500'-0'x19'-6 "
= 29250 sqft
10. Tack Coat = 1500'-0'x19'-6 "
= 29250 sqft
11. Sealed coat = 1500'-0'x19'-6 "
= 29250 sqft
12.Blinding on the street with the bar
= 1500'-0'x19'-6 "
= 29250 sqft
13. Site  Dressing = 1500'-0'x1'-0 "x2
= 3000 sqft

Comments

Popular posts from this blog

Details of Fair Face Concrete