Learn the basics of civil engineering

Image
Learn the basics of civil engineering 1. One cubic meter of brick masonry requires 410 conventional bricks. 2. One cubic foot of brick masonry requires conventional bricks = 11.6 = 12 3. One cubic meter of brick masonry requires metric bricks = 500. 4. Metric brick required for one cubic foot of brick masonry = 14.26. 5. Flat soling of one layer of bricks in one square meter area requires 31 bricks. 6. One square meter of soling requires fine sand = 0.015 cubic meters 7. One layer of bricks for one square meter of herring sister bond requires 52 bricks. 8. One square meter of herringbone bond requires fine sand = 0.03 cubic meters 9. Amount of dry spices in brick masonry = 35% 10. One cubic meter of cement = 30 bags 11. Need for one square meter net cement finishing (NCF) cement = 2.6-3 kg 12. The amount of padlo in DPC is 5% of the weight of cement i.e. 2.5 kg per bag of cement. 13. Weight of one cubic meter of M, S rod = 650 kg or 6.50 quintals 14. Weight of one bag of cement = 50 kg